Kitchens, bathrooms, cabinets, flooring and non-structural walls torn out and hauled off, so your contractor starts on a clean slate.
Most remodels start with a mess that nobody wants to deal with. We tear out what’s going, load it straight into the truck and leave a clean room behind.
Taken apart in the right order, by hand where possible.
Straight into our 20-ft truck. Metal and clean concrete get recycled.
We rake and sweep the footprint before we leave.
What’s included
If we spot suspected asbestos or lead paint, we stop and refer a certified abatement contractor.
Plumbing and electrical should be shut off and capped by your trade pros before tear-out.
Heavy materials are priced by weight, so mention them up front.
Every demolition job is quoted by the project. Photos usually get you a range the same day, and bigger jobs get a free site walk.
What sets the price
Interior demolition is quoted by project, based on what’s coming out and how heavy it is. Text photos for a fast range, or book a free on-site assessment.
No. We tear out non-structural materials. Structural work needs a licensed contractor and permits.
If we spot suspected asbestos or lead-paint materials, we stop and refer a certified abatement contractor.
Yes. Tear-out and haul-off happen in the same visit.
Text photos and get a demolition range, usually the same day.